Skip to content
1Q 1-Quote
Construction Pricing Management for Your Own Rate Card

Construction Pricing Management for Your Own Rate Card

Every calculation in 1-Quote runs off pricing you control. Contractors manage their own priced components, materials, labour, surface types, tiered area-based pricing, and company-wide settings such as minimum job charge and waste percentage, and can edit them without a developer, so rate changes take effect across every quote you build afterward.

Join as a contractor

What it does

  • Priced materials and labour components you set and maintain yourself
  • Surface type management for the general area calculator, each with its own rate
  • Tiered area-based pricing, so rates can change at different area thresholds
  • Company-wide settings such as minimum job charge and waste percentage, applied consistently across quotes
  • Rate changes apply without any developer involvement; pricing is self-service

How it works

  1. 1
    Set up components

    Enter your priced materials and labour rates as reusable components.

  2. 2
    Configure surface types and tiers

    Define surface types and tiered area-based pricing for the general area calculator.

  3. 3
    Set company-wide rules

    Configure settings like minimum job charge and waste percentage that apply across quotes.

  4. 4
    Quote from live pricing

    Every calculator, concrete, retaining wall, crossover, stairs and general area, draws on this rate card when a quote is built.

Frequently asked questions

Do I need a developer to change my prices?

No. Materials, labour, surface types, tiered area pricing and company-wide settings are all editable by the contractor directly.

If I update a rate, does it apply to quotes already sent?

Rate changes apply to quotes built after the change; sent quotes keep the pricing and version they were created with, since quotes retain version history.

Can pricing vary by area size, not just a flat rate?

Yes. The area calculator supports tiered area-based pricing, so rates can change at different thresholds rather than being a single flat rate.

Does pricing management cover more than materials, like minimum job charge?

Yes. Company-wide settings include things like minimum job charge and waste percentage, in addition to individual material and labour rates.

Ready to get started?

Register your business and start building quotes today.

Join as a contractor